Home >

news ヘルプ

論文・著書情報


タイトル
和文:Post-earthquake building assessments 
英文:Post-earthquake building assessments 
著者
和文: Khakurel Shreedhar, YEOW Trevor Zhiqing, Saha Sandip K., Dhakal Rajesh P..  
英文: Shreedhar Khakurel, Trevor Zhiqing Yeow, Sandip K. Saha, Rajesh P. Dhakal.  
言語 English 
掲載誌/書名
和文:Bulletin of the New Zealand Society for Earthquake Engineering 
英文:Bulletin of the New Zealand Society for Earthquake Engineering 
巻, 号, ページ Vol. 56    No. 2    pp. 115-126
出版年月 2023年6月1日 
出版者
和文: 
英文: 
会議名称
和文: 
英文: 
開催地
和文: 
英文: 
公式リンク http://dx.doi.org/10.5459/bnzsee.1568
 
DOI https://doi.org/10.5459/bnzsee.1568
アブストラクト <jats:p>Major seismic events occurring around urban centres often cause widespread damage to the building stock. Engineers are then required to perform safety inspections of these buildings. This process may be time-consuming and can cause residents or businesses to be displaced for a considerable duration even if the building is safe to occupy. Furthermore, other post-earthquake recovery phases, such as repair and demolition/reconstruction works, may not even initiate until the building inspection phase is complete. As such, the disruptions caused by post-earthquake inspection need to be considered when modelling building occupancy/functionality downtime. This study uses the data obtained from the 2011 Christchurch earthquake to develop a post-earthquake inspection duration quantification model. Firstly, the duration of the rapid assessment phase is estimated from the number of damaged buildings to be assessed, the total number of available engineers, and the median time needed for assessing each building. Secondly, the probability of a building being assigned a certain colour tag (White, Yellow or Red) is derived based on the extent of damage. Finally, both sets of information are combined to quantify the post-earthquake inspection duration. A case study is examined to demonstrate the application of the proposed model.</jats:p>

©2007 Tokyo Institute of Technology All rights reserved.